NYCO’s Construction & Maintenance Project List | ||||||
No. |
Client |
Project |
Period |
|||
1 |
TAQA |
Engineering, Procurement and construction of Wash Water Storage Tank (Dia. 12m x Height 14.3 m) in Atrush oil field including: - Engineering Design - Material Supply - Supply and Construction of Foundation - Fabrication - Welding - NDT - Insulation - Painting - Hydrostatic |
Oct. 2019 – Present |
|||
2 |
Sonangol Operations DMCC |
Engineering ,procurement construction and commissioning of 3 storage tanks in QAIYARAH NDS including internal and external coating of the tanks
Including
|
Feb. 2019 -Sep. 2019 |
|||
3 |
DNO |
MECHANICAL, PIPING AND STRUCTURAL CONSTRUCTION SERVICES in Tawki oil Field including coating and painting of piping system
|
April. 2017 - Sep. 2018 |
|||
Full construction and test for 6” Pipeline in Benenan field in Erbil including blasting, coating and insulation of above ground pipeline |
Jan. 2018- Feb. 2019 |
|||||
Installation testing & commissioning of 44 km Fiber Optic Cable (FOC) in Tawki Oil Field |
Jan. 2016 – May 2016 |
|||||
Internal Blasting and Painting of FSK Crude oil storage tank in Fishkhaboor |
Jan. 2019 -Present |
|||||
4 |
|
Construction of 24" pipeline 30 km by using automatic welding technology in saba and luhaise oil field including field coating and painting of welded joints |
Jan. 2014 – Feb 2015 |
|||
5 |
Gazprom |
Repair & Maintenance for (8”,22”,24” & 28” & GRE (4”&16”)) pipelines in Badra Oil Field including :
|
Oct. 2016 – Sep. 2018 |
|||
6 |
CHIYODA |
NGL Maintenance supervision (Static equipment, rotary equipment, electrical, civil, heat exchanger cleaning, instrumentation, valve inspection, Overhead cranes rehabilitation, HSE supervision) |
May 2014 – Nov. 2015 |
|||
7 |
BGC |
Install Gangway at Umm Qaser |
Feb. 2018-Oct. 2018 |
|||
8 |
Crescent
|
Maintenance for 24” gas pipeline with Hot tapping in Chamchamal 61km |
March 2016- April 2016 |
|||
|
|
Survey, Design, Fabrication and installation of 6” piping Sch. 160 in Khormor LPG Plant in Kurdistan Region including NDT (RT & Hydrostatic), blasting and Coating , Packing and installation at site, civil work . |
Oct. 2018 -Present |
|||
9 |
TAQA |
Engineering, supply and installation of heat insulation — diesel lines at CPF in Atrush oil field |
Jan 2017- Dec. 2017 |
|||
Provision of construction supervisors (Civil, Mechanical, Electrical and instrumentation) for pipeline and piping station in Atrush Oil Field |
May 2017-June 2019 |
|||||
10 |
CCC |
Electrical construction, Test and commissioning of MV &LV system of Gas plant in Rumaila oil field. |
Oct. 2015 –April 2016
|
|||
11 |
Bonatti |
Oily Water piping system fabrication activities in Badra Oil Field |
Nov. 2018 –Jan. 2019 |
|||
Oily Water piping system Painting activities in Badra Oil Field |
Nov. 2018 –Jan. 2019 |
|||||
Fabrication of 2” CS Spool in Badra Oil Field including blasting and painting |
Dec. 2018 – Jan. 2019 |
|||||
CCR Chiller connection pipe spools fabrication by welding including blasting and painting |
Dec. 2018 –Jan. 2019 |
|||||
12 |
Alinmaa Company |
Extension, Test & Commissioning of al baker 132 kv GIS substation |
Feb. 2016 –June 2016 |
|||
13 |
Saad Company |
Fabrication & Installation of the Piping (Carbon Steel & Stainless Steel) in different pipe sizes for catalytic reforming unit in Basra refinaly |
Jan 2012 – July 2012 |
|||
14 |
Shell/Majnoon |
Fixing of Control Network in MAJNOON Field in DS1 & DS2 With Shell Company As Well As QC For All CPF Structure Coordinates.
|
Oct. 2010 – 2015 |
|||
15 |
Technip |
Rehabilitation (Electrical & Mechanical) of overhead cranes (10 T &20 T) in Basra gas factory Blasting and repainting of OVER Head cranes |
Dec. 2014 – May 2015 |
|||
16 |
KAR GROUP |
-Maintenance work for Erbil refinery equipment ( pressure vessels, towers, heat exchanger , piping , valves ) -Pressure safety valve repair and setup |
April 2015- june 2015 |
|||
Instrument system installation, test and commissioning for Erbil refinery unit 1 & 2 |
Oct. 2008 – May 2010 |
|||||
Instrument system installation, test and commissioning for Erbil refinery unit 3 & 4 |
April 2010 - Sep. 2010 |
|||||
17 |
CPECC AHDAB Oil Field) |
Pipeline full construction, NDT (100% RT, 100% UT), 100% PWHT, CP, Site Blasting and Painting, hydrostatic for: -155 KM, 6“ Flow lines -81KM ,16” trunk line -70KM 10” Export pipeline -70KM 16” export Gas pipeline Laying ,splicing and test of 81KM FOC
|
Sep. 2010 To 2012 |
|||
18 |
Cpecc (Halfaya Oil Field) |
Pipeline construction, NDT (100% RT, 100%UT, 100% PWHT), CP, FOC, Site Blasting and Painting ,hydrostatic for around 35 KM (6'', 8'', 10'') flow lines. |
Feb. 2012 – Dec 2012 |
|||
19 |
HALLIBURTON |
-Fabrication of steel structures in NYCO workshop including blasting and painting
|
Nov. 2010 To 2012 |
|||
20 |
INTECH INSTRUMENT LTD |
Instrumentation system installation, testing and commissioning and calibration Work in Shikhan Oil Field. |
July 2012 – Dec. 2012 |
|||
21 |
Al-Hayat Co |
Installation, test and commissioning of Pepsi cola factory /Erbil (Mechanical, Electrical & Instrumentation). |
Feb. – June 2008 |
|||
22 |
Al Mansuria Company |
Rehabilitation of Jurf Albamer water treatment plant( electrical, Instrumentation, Mechanical) |
2004 |
|||
23 |
Al Mansuria Company |
Rehabilitation of Al Ramadi Al jadeed water treatment plant
|
2004 |
|||
24 |
ALMCO Co. (Parsons Subcontractor) |
Construction of Alsader Water Treatment Plant(Tanks, piping, electrical ,instrumentation ,civil) |
Nov. 2005 – Feb. 2008 |
|||
25 |
PIONER |
Rehabilitation Al-Rustomia & Al-Karkh Sewage Treatment Plant
|
Sep. 2004 – April 2005 |
|||
26 |
South East Texas Co. |
Mechanical Construction in Al Musaiab Gas Power Station(storage tanks , piping networks & steel structures) |
July 2004 – Feb. 2006 |
|||
27 |
KADO Co. (PARSONS Subcontractor) |
Construction of Al- Zafaraniya Trunk Sewer Line-Pump Station. |
May 2006 – July 2006 |
If you have any construction or inspection work need, simply
call us anytime.
+964-7713584444 or Contact Us