    NYCO’s Construction & Maintenance Project List  

No.

Client

Project

Period

1

TAQA

Engineering, Procurement and construction of Wash Water Storage Tank (Dia. 12m x Height 14.3 m) in Atrush oil field including:

 - Engineering Design

- Material Supply

- Supply and Construction of Foundation

- Fabrication

- Welding

- NDT

- Insulation

- Painting

- Hydrostatic

Oct. 2019 – Present

2

Sonangol Operations DMCC ResizeSonangol Operations DMCC

Engineering ,procurement  construction and commissioning of 3 storage tanks  in QAIYARAH NDS including internal and external coating of the tanks

  • 2 crude oil storage tank 5000 m³ ( 24.384 m x 15.0 m)) external floating roof Type .  
  • One Fire water storage tanks (9.144 m x 11.0 m) fixed roof Type

Including

  • Engineering
  • Civil foundation
  • Material supply
  • Mechanical Construction
  • QAQC and NDT
  • Painting
  • Earthing and CP System
  • Hydrostatic
  • Piping system
  • Instrumentation
  • Tank Calibration

Feb. 2019 -Sep. 2019

3

DNO

MECHANICAL, PIPING AND STRUCTURAL CONSTRUCTION SERVICES in Tawki oil Field including coating and painting of piping system

 

April. 2017 -  Sep. 2018

Full construction and test for 6” Pipeline in Benenan field in Erbil including blasting, coating and insulation of above ground pipeline

Jan. 2018- Feb. 2019

Installation testing & commissioning  of 44 km Fiber Optic Cable (FOC) in Tawki Oil Field

Jan. 2016 – May 2016

Internal Blasting and Painting of FSK Crude oil storage tank in Fishkhaboor

Jan. 2019 -Present

4

 

 
Scop  

 

 

Construction of 24" pipeline 30 km by using automatic welding technology in saba and luhaise oil field including field coating and painting of welded joints

Jan. 2014 – Feb 2015

5

Gazprom

Repair & Maintenance for (8”,22”,24” & 28” & GRE (4”&16”)) pipelines in Badra Oil Field including :

  • Pipeline Damages Repair (Sleeve Repair,  Composite wrapping , Welding Repair &  Clamp Installation)
  • Hot tapping
  • FOC Repair
  • Cathodic Protection (CP) Repair

Oct. 2016 – Sep. 2018

6

CHIYODA

NGL Maintenance supervision (Static equipment, rotary equipment, electrical, civil, heat exchanger cleaning, instrumentation, valve inspection, Overhead cranes rehabilitation, HSE supervision)

May 2014 – Nov. 2015

7

BGC

Install Gangway at Umm Qaser       

Feb. 2018-Oct. 2018

8

Crescent  

 

Maintenance for 24” gas pipeline with Hot tapping in  Chamchamal 61km

March 2016- April 2016 

 

 

Survey, Design, Fabrication and installation of 6” piping Sch. 160 in  Khormor LPG Plant in Kurdistan Region

including NDT (RT & Hydrostatic), blasting and Coating , Packing and installation at site, civil work . 

Oct. 2018 -Present

9

TAQA

Engineering, supply and installation of heat insulation — diesel lines at CPF in Atrush oil field

Jan 2017- Dec. 2017

Provision of construction supervisors (Civil, Mechanical, Electrical and instrumentation) for pipeline and piping station in Atrush Oil Field

May 2017-June 2019

10

CCC

Electrical construction, Test and commissioning of MV &LV system of Gas plant in Rumaila oil field.

Oct. 2015 –April 2016

 

 

11

Bonatti

Oily Water piping system fabrication activities in Badra Oil Field

Nov. 2018 –Jan. 2019

Oily Water piping system  Painting  activities in Badra Oil Field

Nov. 2018 –Jan. 2019

Fabrication of 2” CS Spool  in Badra Oil Field including blasting and painting

Dec. 2018 – Jan. 2019

CCR Chiller connection pipe spools fabrication by welding including blasting and painting

Dec. 2018 –Jan. 2019

12

Alinmaa Company

Extension, Test & Commissioning of al baker 132 kv GIS substation

Feb. 2016 –June 2016

13

Saad Company

Fabrication & Installation of the Piping (Carbon Steel & Stainless Steel) in different pipe sizes for catalytic reforming unit in Basra refinaly 

Jan 2012 – July 2012

14

Shell/Majnoon

Fixing of Control Network in MAJNOON Field in DS1 & DS2 With Shell Company As Well As QC For All CPF Structure Coordinates.

 

Oct. 2010 –  2015

15

Technip 

Rehabilitation (Electrical & Mechanical) of overhead cranes (10 T &20 T) in Basra gas factory

Blasting and repainting of OVER Head cranes

Dec. 2014  – May 2015

 

16

KAR GROUP

-Maintenance work for Erbil refinery equipment ( pressure vessels, towers, heat exchanger , piping , valves )

-Pressure safety valve repair and setup

April  2015- june  2015

Instrument system installation, test and commissioning for Erbil refinery unit 1 & 2

Oct. 2008 – May 2010

Instrument system installation, test and commissioning for Erbil refinery unit 3 & 4

April 2010 - Sep. 2010

17

CPECC AHDAB Oil Field)logo

Pipeline full construction, NDT (100% RT, 100% UT), 100% PWHT, CP, Site Blasting and Painting, hydrostatic for:

-155 KM, 6“ Flow lines

-81KM ,16” trunk line

-70KM 10” Export pipeline

-70KM 16” export Gas pipeline

Laying ,splicing and test of 81KM FOC

 

Sep. 2010 To 2012

18

Cpecc (Halfaya Oil Field)logo

Pipeline construction, NDT (100% RT, 100%UT, 100% PWHT), CP, FOC,  Site Blasting and Painting ,hydrostatic for around 35 KM (6'', 8'', 10'') flow lines.

Feb. 2012 – Dec 2012

19

HALLIBURTON

-Fabrication  of steel structures in NYCO workshop including blasting and painting

 

Nov. 2010 To 2012

20

INTECH INSTRUMENT LTD

Instrumentation system installation, testing and commissioning and calibration Work in Shikhan Oil Field.

July 2012 – Dec. 2012

21

Al-Hayat Co 

Installation, test and commissioning of Pepsi cola factory /Erbil (Mechanical, Electrical & Instrumentation).

Feb. – June 2008

22

 Al Mansuria Company

Rehabilitation of Jurf Albamer water treatment plant( electrical, Instrumentation, Mechanical)

2004

23

Al Mansuria Company

Rehabilitation of Al Ramadi Al jadeed water treatment  plant

  • 10”x500 m ductal iron pipeline,
  • water intake station,
  • rehabilitation work for  electrical, Instrumentation, mechanical )

2004

24

ALMCO Co. (Parsons Subcontractor)

Construction of Alsader Water Treatment Plant(Tanks, piping, electrical ,instrumentation ,civil)

Nov. 2005 – Feb. 2008

25

PIONER

Rehabilitation Al-Rustomia & Al-Karkh Sewage Treatment Plant

  • construction of 16” x1500m Ductile pipeline
  • construction of piping, electrical ,instrumentation ,civil)

Sep. 2004 – April 2005

26

South East Texas Co.

Mechanical Construction in Al Musaiab Gas Power Station(storage tanks , piping networks & steel structures)

July 2004 – Feb. 2006

 

27

KADO Co. (PARSONS Subcontractor)

Construction of Al- Zafaraniya Trunk Sewer Line-Pump Station.

May 2006 – July 2006

NYCO Group