Electrical & Instrument Project

Home Services

Electrical & Instrument Project

    Electrical and Instrumentation Projects List  

No.

Client

Project

Period

1

TAQA

  • Instrumentation & Electrical test and commissioning  services in Atrush oil field /Kurdistan
  • Installation test and commissioning of MV &LV systems

May 2016- Till Present

  • Provision of test and commissioning team with required test equipment in  Atrush oil field /Kurdistan

Jan. 2019 – Till Present

2

AEPEL OASIS

Full electrical test, commissioning and operation of Shatt Al-Basra power plant (1250 MW) 10x125 MW frame 9E including:

  • GT test, GCB and G60 protection system for 10 GT.
  • 136 MV Power transformers 15/400 KV Qty. (10)
  • 15/6.6 KV UAT Power transformer Qty. (10)
  • 400 KV GIS, Switchgear
  • 132 KV GIS Switchgear
  • 6.6 KV Switchgears
  • 400 V Switchgears
  • Auxiliary Transformers 6.6/.4 KV
  • DC System, Batteries and UPS
  • Telecommunication System and PABX
  • MV & LV cables Testing
  • Bus ducts Testing
  • Earthing Network Testing
  • HFO system testing and commissioning

Jan 2015 – April 2016

 

3

J&P Company/ Bassmya Poject Baghdad

Instrument Calibration Services in Bassmya oil field in Baghdad

Electrical Works in Bassmya Oil Field including

Block 03

1. Primary test of
a. GSU transformer 400/15 kV. Qty.(2)
b. UAT transformer 15/6.6 kV. Qty.(2)
c. Excitation transformer. Qty.(2)
d. Isolation transformer . Qty.(1)

2. Secondary test of:
a. G60 relays 4 no.
b. T60 relays 6 no.

3. DC Batters test 220Vdc.

Block 04

Primary test of
a. GSU transformer 400/15 kV. Qty.(2)
b. UAT transformer 15/6.6 kV. Qty.(2)
c. Excitation transformer. Qty.(2)
d. Isolation transformer . Qty.(1)

2. Secondary test of:
a. G60 relays 4 no.
b. T60 relays 6 no.

Fiber Optic Cable (FOC) Splicing and Test

Dec. 2017 - Present

4

Bonatti/ENI

Test and Commissioning of MV systems (Primary and Secondary) in Zubair oil filed

Sep. 2019 - Present

5

Bonatti

Cable line recovery work in Badra oil field

Feb.2020- Present

6

Hanwha Group

Test and Commissioning  of 18 substations 33/11 KV in Basmaya projects

Nov.2019 - Present

7

HUNT OIL

Install, test, and commission on various oil lines, valves, flanges, fittings with Install insulation on pipes, valves, fittings outlined

Sep. 2019- Present

8

Alinmaa Company

Construction, Test & Commissioning of al baker 132 kv GIS substation including:

Installation of new GIS pays

132KV cable pulling  termination and sealing ends installation

SF6 filling

Test and commissioning of the switchgear.

Feb. 2016 – June 2016

 

9

Gazprom

Fiber optic cable Repair for export pipeline 24” in Badra -Gharraf

Jan. 2018 –Present

10

CCC

Electrical construction, Test and commissioning of MV &LV system of Gas plant in Rumaila oil field (transformers, generators, MV switch gear , LV system, distribution board)

Oct. 2015 April 2016

 

11

CHIYODA

NGL Plant assessment and maintenance supervision  including :

  • Electrical Inspection (MV & LV Systems)
  • Instrumentation Inspection and Calibration
  • Valve inspection
  • In Service Calibrations

May 2014 – Nov. 2015

 

12

DNO

Installation testing & commissioning  of 44 km Fiber Optic Cable (FOC) in Tawki Oil Field

Jan. 2016 – May 2016

 

Electrical And Instrumentation Construction Works At Peshkabir Oil Field 2nd Stage Separator

Aug. 2019- Till Present

13

Technip

Electrical & Mechanical Maintenance of overhead cranes in Basra gas factory.

Dec. 2014  – Feb. 2015

 

14

KAR GROUP

QA/QC for Khormala power plant construction project.

Dec. 2012 – June 2014

Instrument system installation, test and commissioning for Erbil refinery unit 1 & 2

Oct. 2008 – May 2010

Instrument system installation, test and commissioning for Erbil refinery unit 3 & 4

 

April 2010 - Sep. 2010

15

INTECH INSTRUMENT LTD

Instrumentation system installation, testing and commissioning and calibration Work in Shikhan Oil Field.

 

 

 

July 2012 – Dec. 2012

16

GE Energy / Europe

QA/QC of South Baghdad/1 Power Station (Civil, Mechanical, Electrical & Instrumentation).

April 2005 – Feb. 2006

Rehabilitation, test and commissioning for the excitation system in almusaiab power plant

Aug. 2016- Nov. 2016

 

Test and Commissioning of Dhiqar and samawa power plant

Dec. 2019- Present

17

Al-Hayat Co 

Installation, test and commissioning for Pepsi cola factory /Erbil (Mechanical, Electrical & Instrumentation).

Feb. – June 2008

18

 Al Mansuria Company

Installation test and commission of LV and

MV systems of jurf albumaire

 

 

Installation test and commission of LV and

MV systems of  AlRamadi Aljadeed water

treatment plant

2005 -2006

19

First Global Investment Group.

Assessment (Mechanical, Electrical & Instrumentation) of Baiji Fertilize Factory.

Jan. 2009 – May 2009

20

ALAMCO

 

Pre Commissioning & Commissioning Activities of Alsadr WTP.

2006

21

ALAMCO Co. (Parsons Subcontractor)

Construction of Alsader Water Treatment Plant.

Nov. 2005 – Feb. 2008

NYCO Group

If you have any construction or inspection work need, simply
call us anytime.

+964-7713584444 or Contact Us

Developed by eSITE