Electrical and Instrumentation Projects List | |||
---|---|---|---|
No. |
Client |
Project |
Period |
1 |
TAQA |
|
May 2016- Till Present |
|
Jan. 2019 – Till Present |
||
2 |
AEPEL OASIS |
Full electrical test, commissioning and operation of Shatt Al-Basra power plant (1250 MW) 10x125 MW frame 9E including:
|
Jan 2015 – April 2016
|
3 |
J&P Company/ Bassmya Poject Baghdad |
Instrument Calibration Services in Bassmya oil field in Baghdad Electrical Works in Bassmya Oil Field including Block 03 1. Primary test of 2. Secondary test of: 3. DC Batters test 220Vdc. Block 04 Primary test of 2. Secondary test of: Fiber Optic Cable (FOC) Splicing and Test |
Dec. 2017 - Present |
4 |
Bonatti/ENI |
Test and Commissioning of MV systems (Primary and Secondary) in Zubair oil filed |
Sep. 2019 - Present |
5 |
Bonatti |
Cable line recovery work in Badra oil field |
Feb.2020- Present |
6 |
Hanwha Group |
Test and Commissioning of 18 substations 33/11 KV in Basmaya projects |
Nov.2019 - Present |
7 |
HUNT OIL |
Install, test, and commission on various oil lines, valves, flanges, fittings with Install insulation on pipes, valves, fittings outlined |
Sep. 2019- Present |
8 |
Alinmaa Company |
Construction, Test & Commissioning of al baker 132 kv GIS substation including: Installation of new GIS pays 132KV cable pulling termination and sealing ends installation SF6 filling Test and commissioning of the switchgear. |
Feb. 2016 – June 2016
|
9 |
Gazprom |
Fiber optic cable Repair for export pipeline 24” in Badra -Gharraf |
Jan. 2018 –Present |
10 |
CCC |
Electrical construction, Test and commissioning of MV &LV system of Gas plant in Rumaila oil field (transformers, generators, MV switch gear , LV system, distribution board) |
Oct. 2015 April 2016
|
11 |
CHIYODA |
NGL Plant assessment and maintenance supervision including :
|
May 2014 – Nov. 2015
|
12 |
DNO |
Installation testing & commissioning of 44 km Fiber Optic Cable (FOC) in Tawki Oil Field |
Jan. 2016 – May 2016
|
Electrical And Instrumentation Construction Works At Peshkabir Oil Field 2nd Stage Separator |
Aug. 2019- Till Present |
||
13 |
Technip |
Electrical & Mechanical Maintenance of overhead cranes in Basra gas factory. |
Dec. 2014 – Feb. 2015
|
14 |
KAR GROUP |
QA/QC for Khormala power plant construction project. |
Dec. 2012 – June 2014 |
Instrument system installation, test and commissioning for Erbil refinery unit 1 & 2 |
Oct. 2008 – May 2010 |
||
Instrument system installation, test and commissioning for Erbil refinery unit 3 & 4
|
April 2010 - Sep. 2010 |
||
15 |
INTECH INSTRUMENT LTD |
Instrumentation system installation, testing and commissioning and calibration Work in Shikhan Oil Field.
|
July 2012 – Dec. 2012 |
16 |
GE Energy / Europe |
QA/QC of South Baghdad/1 Power Station (Civil, Mechanical, Electrical & Instrumentation). |
April 2005 – Feb. 2006 |
Rehabilitation, test and commissioning for the excitation system in almusaiab power plant |
Aug. 2016- Nov. 2016
|
||
Test and Commissioning of Dhiqar and samawa power plant |
Dec. 2019- Present |
||
17 |
Al-Hayat Co |
Installation, test and commissioning for Pepsi cola factory /Erbil (Mechanical, Electrical & Instrumentation). |
Feb. – June 2008 |
18 |
Al Mansuria Company |
Installation test and commission of LV and MV systems of jurf albumaire
Installation test and commission of LV and MV systems of AlRamadi Aljadeed water treatment plant |
2005 -2006 |
19 |
First Global Investment Group. |
Assessment (Mechanical, Electrical & Instrumentation) of Baiji Fertilize Factory. |
Jan. 2009 – May 2009 |
20 |
ALAMCO
|
Pre Commissioning & Commissioning Activities of Alsadr WTP. |
2006 |
21 |
ALAMCO Co. (Parsons Subcontractor) |
Construction of Alsader Water Treatment Plant. |
Nov. 2005 – Feb. 2008 |
If you have any construction or inspection work need, simply
call us anytime.
+964-7713584444 or Contact Us
Copyright © NYCO 2016. All rights reserved.
Developed by eSITE