Plant Integrity and NDT Projects List | |||
---|---|---|---|
No. |
Client |
Project |
Period |
1 |
Exxon Mobil |
Plant integrity with NDT services (Conventional, Advance ,Corrosion Mapping and Industrial Cleaning) including : - Integrity service by API 510, 570 and 653 - Providing inspection coordinators - Welding inspection by certified (CSWIP 3.2,3.1) - NDT Management (NDT level III) - Provision of advance NDT SERVICE and corrosion mapping including :
(IRIS, NFA, RFT, MFL)
- HSE Lead (OSHA/NEBOSH Certified) - Coating/Painting inspection by certified engineers (NACE & BGAS) including (Surface test, painting and coating test & holiday test ) - Rope Access services by certified IRATA Level III, Level II & Level I) - Conventional NDT (RT(Gamma Ray & X-Ray (Crawler and Directional)), UT(Flaw detection and Thickness ), PT, MT, Vacuum Test , Hardness Test ) - Civil Inspection (impact Echo, Core Test, Schmitt Hammer , Ultrasonic Test and Lab. Test) - CIP Survey and DCVG |
2020-2025 |
2 |
Exxon Mobil
|
Plant assessment with full NDT (traditional & advance & Corrosion Mapping) in WQ1 field development (DS6, DS7, DS8) for all static equipment (tanks, vessels, piping ,flow lines, wellheads) including
|
Sep. 2012 – Dec. 2017 |
3 |
BP/ROO |
Plant integrity with full NDT services for south and north rumaila oil field (Five years Contract) including the following activities:
|
May 2017 – May 2022
|
Full NDT Services (Conventional & Advance) and PWHT for south and north Rumaila oil field (three years Contract). |
April 2014 – April 2017 |
||
4 |
BGC / SHELL |
Plant integrity with NDT services (Conventional, Advance ,Corrosion Mapping and Industrial Cleaning ) Contract No. BGC 00573 including : - Integrity service by API510, 570 and 653 - Providing inspection coordinators - Welding inspection by certified (CSWIP 3.2,3.1) - NDT Management (NDT level III) - Provision of advance NDT SERVICE and corrosion mapping including :
(IRIS, NFA, RFT, MFL)
- Tube Exchanger Cleaning - Rotary equipment inspection - E&I Inspection - HSE Lead (OSHA/NEBOSH Certified) - Coating/Painting inspection by certified engineers (NACE & BGAS) including (Surface test, painting and coating test & holiday test ) - Rope Access services by certified IRATA Level III, Level II & Level I) - Conventional NDT (RT(Gamma Ray & X-Ray (Crawler and Directional)), UT(Flaw detection and Thickness ), PT, MT, Vacuum Test , Hardness Test ) - Civil Inspection (impact Echo, Core Test, Schmitt Hammer , Ultrasonic Test and Lab. Test) - CIP Survey and DCVG - Unmanned Aerial Vehicle - Lab Services ( Dye Penetrant Inspection (DPI), Magnetic Particle Inpection (MPI) , Tensile Testing, Hardness Testing, Charpy Impact Testing, Guided-Bend Testing, Metallography, Failure analysis)
|
June 2019 – June 2022 |
4 |
BGC / SHELL |
Plant integrity with NDT services (Conventional , Advance & Corrosion Mapping) including :
IRIS, NFA, NFT, RFT, ECA, ECT & MFL
(Two year contract ) Extended to another two year and extend to another one year |
Aug. 2014 – June. 2019 |
|
5 |
BGC |
Storage Tanks inspection and testing services for 5 Storage tank in Khor Al Zubair and Am Qasar field including
|
July 2017- July 2019 |
|
6 |
BGC |
Hydrostatic Test for breathing air cylinders capacity (2 ltr, 6.8 ltr, 8 ltr) Qty. 293 cylinder in our workshop in Basrah |
Feb. 2019- Feb. 2021 |
|
7 |
CHIYODA |
Inspection Services in Rumaila NGL Plants including
|
May 2014 – Nov. 2015 |
|
8 |
CPP |
Nondestructive Testing (NDT (RT (Crawler & Directional), UT, MT, PT)) for pipelines sizes and Piping Network in West Qurna 1 |
Jan. 2018 – Jan. 2019 |
|
NDT (RT(Gamma Ray & X-Ray (Crawler and Directional, PAUT, UT, MT and PT) for Pipeline and Piping in Rumaila |
June 2019 – June 2020 |
|||
9 |
Tekfan |
NDT ( RT(Gamma Ray & X-Ray (Crawler and Directional), UT, PT & MT) IN Rumaila Oil Field |
Oct. 2018 – Oct. 2020 |
|
10 |
Bonatti |
Painting inspection of Pipe spool services in Badra oil field |
Nov. 2018 – Jan.2019 |
|
Painting inspection of equipment of Oily Tank in Badra Oil Field |
Dec. 2018 – Jan. 2019 |
|||
Plant integrity with NDT services (Conventional, Advance & Corrosion Mapping) Contract No. BGC 00573 including : - Integrity service by API510, 570 and 653 - Providing inspection coordinators - Welding inspection by certified (CSWIP 3.2,3.1) - NDT Management (NDT level III) - Provision of advance NDT SERVICE and corrosion mapping including :
(IRIS, NFA, RFT, MFL)
- Coating/Painting inspection by certified engineers (NACE & BGAS) including (Surface test, painting and coating test & holiday test ) - Conventional NDT (RT(Gamma Ray & X-Ray (Crawler and Directional)), UT(Flaw detection and Thickness ), PT, MT, Vacuum Test , Hardness Test ) - CIP Survey and DCVG
|
Dec. 2019 - Present |
|||
11 |
ENI/Al Arabia |
QA/QC Services in Zubair Oil field including
|
April 2018 – Sep.2019 |
|
PWHT, RT and Hardness Test work for vessels in north rumaila and Hamar Mushrif |
July 2018 – July 2019 |
|||
12 |
ENKA |
Provision of NDT Services for IOT Projects at west qurna 1 |
Nov. 2017- July 2019 |
|
13 |
Kuwait Energy |
Provision of Advance NDT of heat exchanger tube bundles (E-2220 & E-1220) (380 tubes) including (MFL, RFT, IRIS and Videoscope) in SIBA Field.
|
Dec.2019- Present |
|
14 |
TAQA |
Provision of QA/QC, NDT (RT, UT) and coating inspection for pipeline and piping station in Atrush Oil Field |
May-2017-June 2019 |
|
Provision of hydro-Static testing and Dewatering services for 2 flow lines in Atrush oil field |
April 2018 –May 2018 |
|||
15 |
SAMSUNG
|
Provision of NDT Work (RT (Gamma Ray & X-ray) at Hammar Mushref Station, North Rumaila |
Jan. 2017- April 2018 |
|
16 |
Una oil company |
NDT ,PWHT and Hydrostatic test in WQ1 & Rumailla |
March 2015-Sep. 2015 |
|
17 |
Alarabia Industrial company |
NDT ,PWHT and Hydrostatic test in WQ1 T NDT,PWHT and Hydrostatic test in Majnoon oil field |
May 2015 – Aug. 2015 |
|
18 |
Gama |
NDT (Gamma Ray) & PWHT in Hartha Power Plant
|
April. 2017 – July 2019 |
|
19 |
SCOP |
RT Work For Two Gas Pipelines (24”, 16”) 60 km Each. |
June 2014 – August 2015 |
|
RT Work For Two Gas Pipelines (28”, 18”) 58 km Each. |
April 2013 -Dec. 2013 |
|||
NDT for storage tanks |
May 2013-Sep. 2013 |
|||
20 |
HQC |
NDT Services for south and north Rumaila oil field. |
Sept. 2014 – June 2015 |
|
21 |
CCC |
NDT Services (RT , UT, PT, MT) in North Rumaila Oil Field ( two year contract ) |
Jan. 2015 – Aug. 2015 |
|
22 |
ENI / STX |
NDT service (RT, UT, PAUT) in Zubair oil field. |
Oct. 2014 – Feb 2015 |
|
23 |
ENI / SICIM |
NDT service in Zubair oil field. |
Oct. 2014-Jan 2015 |
|
24 |
Shell/Majnoon |
|
Oct. 2010 – 2015 |
|
25 |
KAR GROUP |
QA/QC & NDT for Construction of 78 Km 20” Pipeline &51 km *36", Flow lines 6”, pipeline 24” |
May 2008 – Oct. 2014 |
|
Testing of Gas Pipeline ( QA/QC, NDT, Hydrostatic Test, Drying ) Khormalla Oil Field 130 Km. |
Dec. 2012 – Oct. 2014 |
|||
QA/QC, NDT in Construction of Khormalla Oil Field (CPF) (piping, storage tanks & mechanical equipment). |
Nov. 2008 – Oct. 2010 |
|||
QA/QC, NDT in Construction of Erbil Refinery 1 & 2. |
Oct. 2008 – May 2010 |
|||
QA/QC, RT for 24” & 36” pipeline in Baviam area/Shikhan in Kurdistan Iraq |
Dec. 2017 –Feb. 2018 |
|||
QA/QC , NDT for Khormalla power plant |
Sep. 2013 – May 2014 |
|||
26 |
KAR GROUP (Crescent-Danagas Subcontractor) |
QA/QC, NDT in Construction of LPG Recovery Plant. |
May 2008 – March 2009 |
|
27 |
Crescent Pertoleum |
INSPECTION , REPLACEMENT GUIDE & ANCHOR BOLTS for 4 Vessels (2 De-ethanizer Tower and 2 De-butanizer tower |
April 2018 – July 2019 |
|
28 |
Luckoil / Techno |
RT for 42" Export pipeline in WQ2 oil field |
Dec. 2012 |
|
29 |
CPECC (AHDAB Oil Field) |
Pipeline full construction, NDT (100% RT, 100% UT), 100% PWHT, CP, hydrostatic for: -155 KM, 6“ Flow lines -81KM ,16” trunk line -70KM 10” Export pipeline -70KM 16” export Gas pipeline |
Sep. 2010 To 2012 |
|
30 |
CPPB (AHDAB Oil Field) |
100% RT for 36" Pipeline EXL4. 70 Km |
Feb. 2011 – April 2011
|
|
31 |
Cpecc (Halfaya Oil Field) |
Pipeline construction, NDT (100% RT, 100%UT, 100% PWHT), CP, FOC, hydrostatic for around 35 KM (6'', 8'', 10'') flow lines. |
Feb. 2012 – Dec. 2012 |
|
32 |
HALLIBURTON |
NDT activities |
Nov. 2010 To 2012 |
|
33 |
Techno (AL-AHDAB Oil Field & MAJNOON)
|
100% RT For 24" Pipeline EXL1 212 km. (CPECC / Ahdeb) NDT For Brown Field MAJNOON (shell) |
Dec. 2009 – To 2013
|
|
34 |
ENKA (MAJNOON) |
NDT in MAJNOON Oil Field. |
Nov. 2011 – May 2012 |
|
35 |
Weir Service |
NDT & PWHT in Zubair oil field. |
May 2012 – Jan 2013 |
|
NDT for 0.5”-24 “ pipe in North Rumaila |
April 2016-Nov.2019 |
|||
36 |
Ibn Majid company |
PWHT for pressure vessels RT for pipelines in WQ1 |
Periodic order |
|
37 |
Petrofac |
NDT Work in Majnoon Oil Field.
|
April 2012 – Aug. 2012 |
|
38 |
ABB |
QA/QC And NDT in Erbil Gas Power Stations (500 MW). |
April 2007 – Sep. 2008 |
|
39 |
SIEMENS |
NDT for piping in Taza Power Station. |
May 2014 - Nov. 2014 |
|
40 |
LAKESHORETOLTEST |
NDT, Hydrostatic in Garraf Oil Field. |
Dec. 2012 to 2013 |
|
41 |
Weatherford |
UT & Hydrostatic for piping. |
Jan. 2013 to Feb. 2013 |
|
42 |
Dana Gas |
NDT Work For The Flow Lines & Piping |
2008 |
|
43 |
ALMCO Co. (Washington Group) |
NDT service in Basrah Gas Factory NDT service in WQ1 |
2012,2016
|
|
44 |
RTD Applus |
Digital radiography (CR) in DS5/Rumaila Oil Field |
March 2014 |
|
45 |
Pan East |
NDT activities in Zubair oil field.
|
2013 |
|
46 |
Energy Logistics |
NDT activities in Erbil. |
2014 |
|
47 |
HERMIC (HALFAYA) |
NDT & PWHT for trunk lines in HALFAYA Oil Field |
Dec. 2011 – June 2012 |
|
48 |
Sert Company
|
NDT & PWHT flow lines in HALFAYA Oil Field. |
March 2012-Sep. 2012 |
|
49 |
MEE |
Hydrostatic, PWHT, NDT for Al Garraf Export Pipeline 7 km. |
Sep. 2012 to 2013 |
|
50 |
MOC |
Supplying and training of NDT equipment |
Dec. 2014 |
|
51 |
PES |
NDT in TAQTAQ Oil Field.
|
June 2010 - 2011 |
|
52 |
TAAM (BP Subcontractor) |
RT For The Flow Lines in Rumaila Oil Field.
|
June 2011 |
|
53 |
The Pioneer Co.
|
QA/QC, NDT For Kubaisa Cement Factory Rehabilitation. |
Dec. 2010 – Feb. 2011 |
|
54 |
Mass Global Investment |
Gas turbine inspection (FPI.UT, MT, VT) in Sulimanya & Erbil Gas power plant and Erbil gas power plant |
Periodic Test |
|
55 |
TAGC |
NDT (RT, PT, Vacuum test, Hydrostatic, holiday test, coating) for tanks and piping. |
April 2013 – May. 2014 |
|
56 |
EMC |
NDT & QA/QC |
Oct. 2013 |
|
57 |
Ratbaa |
RT for pipeline, piping & CP test posts. |
June 2013 |
|
58 |
GE |
QA/QC for south Baghdad 1 gas power plant project including
|
|
If you have any construction or inspection work need, simply
call us anytime.
+964-7713584444 or Contact Us
Copyright © NYCO 2016. All rights reserved.
Developed by eSITE