Valve maintenance & Repair projects

Home Services

Valve maintenance & Repair projects

No.

Client

Project

Period

1

CPP

Calibration Services of instruments devices in our lab. in Basrah

 June 2018- Nov. 2018

2

CHIYODA/BGC

 

 

 

Repair & Maintenance of Control Valves & actuators in Rumaila NGL

May 2014- Nov

2015

3

Enka

Provision of Pressure Relief Valve (PRV) Testing and Calibration  services at our workshop in WQ1 

Aug. 2018 – Oct. 2018

4

ENI/Alarabia

Provision of calibration , repair, commissioning and re-commissioning of instrument such as (pressure differential transmitter, level transmitter, level indicator control, pressure indicator , level control valve, level switch high- high , level switch low-low )

Oct. 2018 - Present

5

STX

Calibration, Repair of PSV in Gharaff Oil Field

April 2016

6

hyundai/Vits roses

Calibration, Repair of PSV in AL Qudis Power Plants / Baghdad

Feb. 2016

7

Kar      

Maintenance of (Gate , Globe, ball, non-return, PSV & PCV) Valves in Erbil Refinary

April 2015-

June 2015

8

ORYX          

Repair and Setup of Pressure Safety Valves (PSV)

Feb 2015- Dec.2017

NYCO Group

If you have any construction or inspection work need, simply
call us anytime.

+964-7713584444 or Contact Us

Developed by eSITE